Baheya Elsheikh Zayed Hospital is a specialized hospital in Egypt that focuses on the diagnosis and treatment of breast cancer. It was founded in 2015 and is named after the late Baheya Elsheikh Zayed, who died of breast cancer. The hospital provides a range of services related to breast cancer, including screening, diagnosis, surgery, radiation therapy, chemotherapy, and support services. It is located in Giza, Egypt, and is considered one of the leading hospitals for breast cancer treatment in the region.

Located in the heart of Zayed City, Egypt , Baheya is the first free of charge center in Egypt specialized in early detection and treatment of women diagnosed with breast cancer.

The BAHEYA Hospital will include:

  • 3-Basement + Ground Floor + 4- Floors + 1 Roof .

Project Shots & live:

LOCATIAN
Zayed–Giza, Egypt

AREA
Site area of 6000 sqm
BUA 27500 sqm

COST
590 Millions Egyptian pound

CLIENT
BAHEYA

CONSULTANTS
Concord Consulting Group (Designer)
Vital Konzept (Site Supervision)
KEM (MEP) (Designer)

Contractor
CONSERV (Civil Works)
ECS (MEP Works)

MY Role:

  1. BIM Model

  2. Technical Office Drawings (Shop-Drawing)

  3. Coordination between Discipline.

  4. Coordinate Between Architecture and Interior Designs

  5. Design Coordination (RFI)

  6. QS

  7. Support Suppliers and Sup Contractors

  8. Support Site Requirements

MY Responsibility:

  • Member of Technical and BIM unit at the SITE

  • Lead a small team of 2 engineers to finish the tasks as per time schedule.

  • BIM model level of detail 400 .
    Coordinate between architecture drawing and interior design drawing.

  • Coordinate between architecture drawing and the other disciplines (structure team and MEP team) .

  • Technical Drawings Submission as per site requirements

THIRD BASEMENT FLOOR:

  • Radiotherapy Department (2245sqm)

  • Nuclear Medical Department (360sqm)

  • Sterilization (415sqm)

  • Laundry (270sqm)

  • Kitchen (580sqm)

  • Water Tanks (535sqm)

  • Administration (890sqm)

SECOND BASEMENT FLOOR:

  • Garage (4500sqm)

  • Mortuary (385sqm)

  • Mechanical Area (775sqm)

  • Waste Management (100sqm)

FIRST BASEMENT FLOOR:

  • Imaging Department (715sqm)

  • Outpatient Pharmacy (55sqm)

  • Physiotherapy (145sqm)

  • Auditorium 250 per. (620sqm)

  • Pathology Department (940sqm)

  • Chemistry Department (245sqm)

  • Emergency (260sqm)

  • Prayer

GROUND FLOOR:

  • Outpatient Surgical Clinics (870sqm)

  • Research Center (90sqm)

  • Administration (690sqm)

  • Commercial Areas  (400sqm)

  • Auditorium (152sqm)

FIRST FLOOR:

  • Chemotherapy Clinics (879sqm)

  • Clinical Pharmacy (247sqm)

  • Chemotherapy Department (860sqm)

  • Administration  (310sqm)

  • Doctor Training Center (683sqm)

Second FLOOR:

  • Inpatient Rooms (1972sqm)

  • I.C.U. Surgical (309sqm)

  • Operating Surgical (768sqm)

Third FLOOR:

  • Inpatient Rooms 

Fourth FLOOR:

  • Offices and Administration 

BAHEYA ZAYED HOSPITAL

My WORK:
BIM Modeling:

My WORK:
Technical Office:

  • Blockwork

  • Partitions

  • Flooring

  • Bathroom with different types

  • Wall-Finish

  • Door Studies

  • ID Drawings

  • QS Submissions

  • Demolished

  • Modifications Drawings

  • Toilet Cubical

  • Wall-Guard

Blockwork:

Toilet Cubical:

Flooring:

General Arrangement: